Professional Engineering Services Since 2008
Mon to Fri - 08:00 to 05:00
1-254-899-0899
This project included the design of a new 50,000 gallon ground storage tank and 1000 l.f. of new 8” PVC water main extending and connecting to the existing water supply system in McLennan County, Texas. This project also included the design of the tank site location, new pump building, hydropneumatic pressure tank, electrical controls, and…
This project consisted of an Engineering Study and Assessment of the Williamson Creek Sanitary Sewer Interceptor. CCTV camera inspection, sanitary sewer flow monitoring and infiltration analysis. It included the design of 18,200 linear feet of a new sanitary trunk sewer interceptor. Primary Tasks: Identification of existing interceptor system CCTV inspection • Flow monitoring & infiltration…
This project included the design of new 12” ductile iron water main extending from the Cedar Knob pump station to a new elevated storage tank and Evergreen Phase IV subdivision development in Harker Heights, Texas. The total length of the new 12” ductile iron water main was approximately 5500 linear feet. The 12” water main…
The new Solar Energy Facility is located on the Veterans Administration property, on a historic landfill, in Temple, Texas. It is an 13 acre solar farm providing an alternative power source to augment the energy needs of the Veterans Administration facilities. Primary Tasks: Topography survey Coordination with TCEQ Site erosion control design Site grading design…
Due to recent residential growth and expansion, into West Temple, a new major arterial is required to meet the growing transportation needs. The Poison Oak Road Realignment consists of the realignment, widening, and reconstruction of an existing county road located in Temple, Texas. This project includes the design of 8,800 linear feet of a new…
This project included the design of a new 18” ductile iron water main extending from the existing 14” water main located within Avenue H. The total length of the new 18” water main was approximately 2,650 linear feet. This project also included the design of approximately 2,700 linear feet of new 6” water mains located…