Commerce Drive Extension & Regional Detention Pond

Belton, TX

The Commerce Drive Extension provided a much needed connection from Sparta Road to FM 439 (Lake Road) in a rapidly growing area of Belton, Texas alleviating congestion on FM 317 (Main Street) and providing a regional detention pond to facilitate future development in the area while correcting existing drainage issues. This project included the design…

2013 Western Hills Roadway and Utility Replacement Project

Temple, TX

This project included the design of new 8” PVC Water Mains, new 8”, 10”, and 12” PVC Sanitary Sewer Mains, new 15”, 24”, 30”, and 36” RCP Storm Sewer, and new Reinforced Concrete Roadways located within the existing Western Hills subdivision in Temple, Texas. The total lengths of utilities installed were 6,500 l.f. of new…

Beal Street Regional Drainage Improvements

Belton, TX

This Drainage project for the City of Belton included the regional drainage analysis, design and construction documents for a new regional detention pond was needed to aid in the rapid growth along FM 317 in Belton and would be used to detain storm water from a proposed HEB grocery store as well as the development…

2010 Steeplechase Lift Station Reconstruction

Temple, TX

This project consisted of providing a new sanitary sewer lift station replacement within the Steeplechase subdivision located in Temple, TX. The project provided a new 28’ deep 8’ diameter sanitary sewer wet well, new submersible wastewater solids handling pumps, new 4” PVC force main, and a new 8” PVC gravity main replacement to replace an…

2012 Friars Creek Lift Station Improvements

Temple, TX

This project consisted of providing mechanical and electrical improvements to the existing sanitary sewer lift station which serves all of South Temple. This project is located at S. 31st and Highway 93 in Temple, TX. The project provided (3) new 200 HP Drywell pumps, motors, electrical rehabilitation, new VFD’s and control panels, building improvements and…

2013 Evergreen Elevated Storage Tank

Harker Heights, TX

Project Summary: This project included the design of a new 150,000 gallon elevated water tank to provide water to a growing area of Harker Heights. This project also included the design of the tank site location, renovation of an existing pump station, electrical controls, and SCADA system. Primary Tasks: Topography surveys Construction staking Development of…