The City of Temple sidewalk improvements along South First Street, within TxDOT right-of-way, was funded through a Community Development Block Grant (CDBG) and is designed to be completed in multiple phases as funds become available. This project includes the rehabilitation of 2,000 linear feet of existing broken and falling sidewalks with decorative brick pavers and…
The City of Temple sidewalk improvements along Avenue G was funded through a Community Development Block Grant (CDBG) and is designed to be completed in multiple phases as funds become available. This project included the rehabilitation of the 3,800 linear feet of existing broken and falling sidewalks, curbs, and driveways along Avenue G. Primary Tasks:…
The Commerce Drive Extension provided a much needed connection from Sparta Road to FM 439 (Lake Road) in a rapidly growing area of Belton, Texas alleviating congestion on FM 317 (Main Street) and providing a regional detention pond to facilitate future development in the area while correcting existing drainage issues. This project included the design…
This project included the design of new 8” PVC Water Mains, new 8”, 10”, and 12” PVC Sanitary Sewer Mains, new 15”, 24”, 30”, and 36” RCP Storm Sewer, and new Reinforced Concrete Roadways located within the existing Western Hills subdivision in Temple, Texas. The total lengths of utilities installed were 6,500 l.f. of new…
Due to recent residential growth and expansion, into West Temple, a new major arterial is required to meet the growing transportation needs. The Poison Oak Road Realignment consists of the realignment, widening, and reconstruction of an existing county road located in Temple, Texas. This project includes the design of 8,800 linear feet of a new…