Williamson Creek Trunk Sewer Improvements

In Sanitary Sewer Systems

This project consisted of an Engineering Study and Assessment of the Williamson Creek Sanitary Sewer Interceptor. CCTV camera inspection, sanitary sewer flow monitoring and infiltration analysis. It included the design of 18,200 linear feet of a new sanitary trunk sewer interceptor.

Primary Tasks:

  • Identification of existing interceptor system
  • CCTV inspection • Flow monitoring & infiltration analysis (INI)
  • SWMM interceptor system modeling • Analysis of collected data
  • Field verification of system manholes
  • Inspection & assessment of system lift stations
  • Identification of existing right-of-way & easements
  • Future growth determination & system impact analysis
  • Topography surveys
  • Easement acquisition services
  • Construction staking
  • Preliminary and final designs
  • Development of project estimates & budgets
  • Bidding and construction administration
  • Project phasing determination
  • Coordination with BNSF & Union Pacific Railroads
  • City of Temple coordination
  • TxDOT coordination • Oncor & Atmos coordination